Home > Working with SGWorld > ProjectTree (IProjectTree6) > SetGroupStartTime
Determines the date and time when a group should start being visible
JavaScript |
|
GetGroupStartTime( GroupID) |
C# |
|
dynamic GetGroupStartTime( int GroupID) |
C++ |
|
HRESULT GetGroupStartTime( LONG_PTR GroupID, VARIANT * pVal) |
Parameters
GroupID
The Project Tree group whose start time is being set. You can obtain the GroupID by one of the following methods:
§ Create the group using IProjectTree6.CreateGroup.
§ Find the group, if you know the name, using IProjectTree6.FindItem.
§ Traverse the Tree using IProjectTree6 methods such as GetNextItem(), until you come to the desired GroupID.
Return Value
pVal
The start date and time for the group.
Exceptions
HRESULT can return any of the values listed in the HRESULT Return Values list, as well as the following values:
TE_E_INFOTREE_PARENTNOTGROUP |
The group ID entered does not represent a valid group in the project tree. |
TE_E_INFOTREE_ITEMNOTGROUP |
The item entered is not a group and therefore cannot be used as a group. |
TE_E_INFOTREE_CANTUSEROOT |
Can not use tree root for this operation |
TE_E_INFOTREE_ITEMISGROUP |
ItemID is a group so an object cannot be retrieved. |